Skip to main content
Loading…
This section is included in your selections.

If the approved plans, Right-of-Way Use Permit, or Small Cell Permit specifies the location of Telecommunications facilities by depth, line, grade, proximity to other Telecommunications facilities or other standard and if requested by the City, the permittee, at its cost, shall cause the location of such Telecommunications facilities to be verified by record drawings, pre-construction locates, a state-registered land surveyor or by other means of locating as agreed upon by the City and permittee. The permittee may be required to relocate any Telecommunications facilities which are not located in compliance with the approved plans, Right-of-Way Use Permit, or Small Cell Permit requirements. (Ord. 2965 § 2 (part), 2019: Ord. 2925 § 2 (part), 2018: Ord. 2175 § 1 (part), 2003).