Skip to main content
Loading…
Article VII. Small Cell Permits
This article is included in your selections.
This section is included in your selections.

A. Issuance of a Small Cell Permit to install a Small Cell facility or network in the public ways shall be contingent upon approval of a Master Permit or the possession of a valid Master Permit. An Applicant may apply for a Small Cell Permit at the same time as the Applicant applies for a Master Permit; however, no Small Cell Permit will be granted until such Master Permit is approved by the Director, which may occur at the same time.

B. Small Cell facilities may not be located in utility easements or public easements that are not adjacent to the public ways, unless specifically approved by the Director. (Ord. 2965 § 2 (part), 2019: Ord. 2925 § 2 (part), 2018).