Skip to main content
Loading…
This section is included in your selections.

A. General, Structure Condition. A structure movement permit for Class I and II moves shall not be issued for an affected structure that meets any of the following conditions:

1. The affected structure is so constructed or in such condition as to constitute a danger of injury or death through collapse of the building, fire, defects, and electrical wiring or other substantial hazard to the individual(s) who occupy or enter said building after relocation;

2. The affected structure is infested with rats or other vermin, or the wood members of which are infested with rot, decay, or insects;

3. The affected structure is so unsanitary or filthy that it would constitute a hazard to health of the individual(s) who will occupy said affected structure after relocation, or if not intended for occupancy by humans, would make it unsuitable for its intended use;

4. The proposed use of the building is prohibited at the proposed destination site under the zoning or other land regulations of the City;

5. The affected structure or destination site does not conform to all applicable provisions of law or ordinance; and

6. The affected structure could not meet those codes that would allow it to be occupied.

B. General, Destination Site Condition. For a structure movement permit for Class I and II moves, the applicant shall demonstrate and comply with the requirement that the structure shall be able to be occupied within 90 days of the date of placement on the destination site; and any other conditions of approval or applicable provisions of code. A proposed site plan for the destination site includes appropriate landscaping and provisions to rehabilitate those areas of the site affected by the structure relocation. The site plan shall provide for adequate landscaping of a stature and quality that does not detract from the neighborhood. The landscaping and rehabilitation approved in the proposed site plan shall be completed within 120 days of occupancy.

C. General, Originating Site Condition. For structure movement permits for Class II and III moves, the applicant shall demonstrate and comply with the requirement that: A proposed site plan for the originating site includes appropriate landscaping and provisions to rehabilitate those areas of the site affected by the structure relocation. The site plan shall provide for adequate landscaping of a stature and quality that does not detract from the neighborhood and shall demonstrate how rehabilitation shall meet the requirements of RMC 15.22.090.F, Condition of Lot.

D. Nonresidential Uses. In addition to subsections A, B, and C of this section, for nonresidential uses the proposed use, structure, and site shall obtain all other City development approvals, including, but not limited to, design review board approval, site plan entitlement approval, and shoreline substantial development permit, before the City can issue a structure movement permit. (Ord. 2596 § 2 (part), 2011; Ord. 2215 § 9 (part), 2004; Ord. 2160; Ord. 2014. Formerly 20E.30.10-060).