Skip to main content
Loading…
This section is included in your selections.

A. Clearing and grading and stormwater management fees shall be determined by the Director, and upon approval by the City Council shall be made available to the public.

B. Before accepting a set of plans and specifications for checking, the Director shall collect a plan-checking fee. Separate permits and fees shall apply to retaining walls or major drainage structures as required by the Uniform Building Code. There shall be no separate charge for standard terrace drains and similar facilities. The amount of the plan-checking fee for clearing/grading plans shall be as set forth in the schedule of fees adopted pursuant to Redmond Zoning Code Chapter 21.76, Review Procedures. (Ord. 3081 § 2, 2022; Ord. 2860 § 3 (part), 2016: Ord. 2596 § 2 (part), 2011: Ord. 2532 § 2 (part), 2010: Ord. 2218 § 1, 2004).